Specifications
76 Part Number STH12 9/10
Start-up (with ERC)
PLACING EQUIPMENT IN OPERATION
Before placing equipment in operation, verify that all
requirements for roof mounted Remote Condenser
Units (if applicable) have been satisfied. Refer to the
instructions on installing the Remote Condenser.
Verify proper supply power to unit.
1. Fill the refrigeration unit water bath tank with
water to within 1/2" (1.27 cm) of the top of the
overflow tube.
2. Open the manual water shut-off valve to the water
cooled condenser (if applicable). Refer to
“Electronic Control” for control programming
sequence.
3. Press “Comp/Agit” to begin building an ice bank.
4. Ice will begin to form on the evaporator coils in
approximately 2 hours.
5. The refrigeration unit will build an ice bank in
approximately 4 to 6 hours.
6. If optional CO
2
/Water Control Panel has been
installed on the refrigeration unit, refer to the
installation instructions for operation and testing
the circuits for leaks.
7. The carbonation circuits “A” and “B,” as well as
the syrup circuits must be checked for leaks and
possible cross circuits before turning ON the
water supply to carbonator pumps.
8. Turn on main water supply. Set incoming
regulator to 55 psi on the CO
2
/Water control
panel. Once water is supplied to the unit, air
needs to be purged from the carbonator tank. Do
so by lifting press relief valve tab until water
comes out of relief valve.
9. Set bag-in-box syrup tank push pressure CO
2
regulator to 60 psi.