Specifications
74 Part Number STH12 9/10
Sequence of Operation (Non-ERC)
PRE-MIX REFRIGERATION UNIT
Ice Bank Is Required
1. Check water bath for full ice bank.
2. The stabilized water bath operating temperature
must be maintained at 33°F (0.6°C) to 35°F
(1.7°C).
The following is a sequence of operations for the
Multiplex Pre-mix Beverage equipment.
1. Once a drink is dispensed, the following will
occur:
A. For a Syrup Tank System, the Pre-mix syrup
is manually mixed at the store. Pre-mix
beverage is then transferred to a holding tank
for supply to the Multiplex system.
B. For a Bag-In-Box System, pre-mix syrup is
drawn from a Bag-In-Box by means of a gas
driven syrup pump.
2. The carbonator pump (stainless) pulls the 5:1
pre-mix out of the 3 gallon holding tank and injects
it into the pre-mix carbonator tank where the CO
2
pressure is 35 psi (2.4 bar) on the tank.
3. The circulator pump runs continuously and
circulates water bath water through the conduit to
provide cooling for all drinks.