Specifications

Part Number STH12 9/10 71
Equipment Setup Procedure (Non-ERC)
1. Ensure that all valve nozzles are attached to the
valves.
2. Observe pressure of CO
2
high pressure tank of
500 psi (34 bar) or more, or bulk CO
2
tank of
150 psi or more. Primary regulator set at 90 psi
(6 bar) and the secondary regulator set at 35 psi
(2.4 bar).
3. Observe the control panel to verify that all
pressure gauges are set at correct operating
pressures.
4. Check the syrup tanks to make sure a sufficient
number of tanks are connected in series to satisfy
business volume.
5. Clean syrup inlet and outlet quick disconnects at
the same time tanks are replaced. Rinse
disconnects in clean potable water.