Preparing Ice Bank with ERC
BUILDING AN ICE BANK
1. At this time, fill the unit water bath tank to the top,
or within 1/2" (1.3 cm) of the top minimum, of the
overflow tube. Use a garden hose or another
water supply to do this.
NOTE: A manual fill valve is incorporated into the
water circuit to the carbonator tank. This valve can be
used to manually add water lost for any reason. Do not
leave this valve ON constantly, only use it for filling and
topping off. The water bath must be drained, flushed,
and refilled every six months.
2. Main power to unit must be on. Power delay of 30
seconds occurs when power applied. “Pd30”
3. Press COMP/AGIT switch on keypad display.
4. Agitator will come on immediately and
compressor delay will start. “Cd99” will count from
180 to 0.
NOTE: Turn this switch OFF to perform any operations
in the water bath area.
With water bath water temperature of 65°F (18°C), ice
will begin to form on the evaporator coils in
approximately 2 hours. The unit will build a full ice
bank in approximately 4 to 6 hours (depending on
ambient water temperature).
Drain Tube
Overflow
Tube
Water Bath
Tank
Tab
Clamp