User Manual

Section 2 Installation Instructions
Part Number 000008463 Rev01 4/15 9
5. Route line voltage wires (Black & White) through line
voltage Heyco fitting and attach to L1 and L2
contactor terminals.
NOTE: Three phase models do not have open terminals
on contactor. Remove two wires from contactor, install
supplied electrical connector and connect wires.
6. Route LuminIce™ hoses to evaporator and attach.
Insert hose closest to the control box in the bottom
evaporator bulkhead hole.
Insert the other hose in the upper evaporator
bulkhead hole.
7. Install the evaporator dust cover and test run the ice
machine and LuminIce™. The Luminice™ is
energized whenever power is applied to the ice
machine.
Route Through Line Voltage Heyco
and
Attach to Contactor Terminals
LuminIce™ Power
L1
N
Ice Machine Power
Incoming Power Supply