User Manual
Table Of Contents
30  Part Number 000014141 Rev 07 2/20
Installation  Section 2
Step 4  Open Valves for the Line Set and 
Receiver.
You will not hear refrigerant flow when the 
valves are opened. Refrigerant will not flow 
until the ice machine is started and the 
solenoid valve opens.
•  All valve caps must be reinstalled, 
tightened and leak-checked to assure no 
refrigerant leakage exists.
•  Counterclockwise opens all valves. Open 
the shutoff valves for the suction and 
liquid lines. 
USE ALLEN WRENCH TO OPEN 
(TURN COUNTERCLOCKWISE) 
SHUTOFF VALVES FOR THE LIQUID 
AND SUCTION LINES
QuietQube Models
USE ALLEN WRENCH 
TO OPEN (TURN 
COUNTERCLOCKWISE) 
SHUTOFF VALVES 
FOR THE LIQUID AND 
SUCTION LINES
Ice Beverage Models
USE ALLEN WRENCH TO OPEN 
(TURN COUNTERCLOCKWISE) 
SHUTOFF VALVES FOR THE 
LIQUID AND SUCTION LINES
IF1400C/IF1800C/IF2100C
Notice
After opening suction, discharge and 
receiver service valves, refrigerant 
pressure will not be detected until the 
ice machine starts a freeze cycle and the 
solenoid valves energize.










