Service Manual
Table Of Contents
- Safety Notices
- Definitions
- General Information
- Installation
- Stacking Two Ice Machines on a Single Storage Bin
- Location of Ice Machine
- Clearance Requirements
- Dual Evaporator Model Installation on a Manitowoc Bin
- Ice Machine on a Dispenser Installation
- Water Supply and Drains
- Lineset Applications
- QuietQube® Remote Condensing Unit
- Additional Refrigerant Charge For 51' to 100' Line Sets
- Maintenance
- Operation
- Menu Navigation
- Component Check Procedures
- Control Board, Display And Touchscreen
- Operating an ice machine without a Touchscreen
- Control Board Relay Test
- Programming A Replacement Control Board
- USB Flash Drive Specifications and Formatting
- Exporting Data to a Flash Drive
- Upgrading Firmware with a Flash Drive
- Main Fuse
- Bin Switch
- Water Level Control Circuitry
- Ice Thickness Probe (Initiates Harvest)
- Bin Level Probe
- Thermistors
- High Pressure Cutout (HPCO) Control
- Low Pressure Cutout (LPCO) Control
- Compressor Time Delay
- Fan Cycle Control
- Harvest Assist Air Pump
- Compressor Electrical Diagnostics
- Diagnosing Start Components
- Refrigeration Components
- Recovery/Evacuation/Charging Procedures QuietQube® Models
- System Contamination Clean-Up
- Total System Refrigerant Charge QuietQube® CVD Models
- Control Board, Display And Touchscreen
- Charts
- Diagrams
Safety Notices
Read these precautions to prevent personal injury:
• Read this manual thoroughly before operating,
installing or performing maintenance on the
equipment. Failure to follow instructions in this
manual can cause property damage, injury or death.
• Routine adjustments and maintenance procedures
outlined in this manual are not covered by the
warranty.
• Proper installation, care and maintenance are essential
for maximum performance and trouble-free operation
of your equipment.
• Visit our website www.manitowocice.com for manual
updates, translations, or contact information for
service agents in your area.
• This equipment uses high voltage electricity and
contains refrigerant charge. Installation and repairs are
to be performed by properly trained technicians aware
of the dangers of dealing with high voltage electricity
and refrigerant under pressure. The technician
must also be certified in proper refrigerant handling
and servicing procedures. All lockout and tag out
procedures must be followed when working on this
equipment.
• As you work on this equipment, be sure to pay close
attention to the safety notices in this handbook.
Disregarding the notices may lead to serious injury
and/or damage to the equipment.