Service Manual
Table Of Contents
- Safety Notices
- Definitions
- General Information
- Installation
- Stacking Two Ice Machines on a Single Storage Bin
- Location of Ice Machine
- Clearance Requirements
- Dual Evaporator Model Installation on a Manitowoc Bin
- Ice Machine on a Dispenser Installation
- Water Supply and Drains
- Lineset Applications
- QuietQube® Remote Condensing Unit
- Additional Refrigerant Charge For 51' to 100' Line Sets
- Maintenance
- Operation
- Menu Navigation
- Component Check Procedures
- Control Board, Display And Touchscreen
- Operating an ice machine without a Touchscreen
- Control Board Relay Test
- Programming A Replacement Control Board
- USB Flash Drive Specifications and Formatting
- Exporting Data to a Flash Drive
- Upgrading Firmware with a Flash Drive
- Main Fuse
- Bin Switch
- Water Level Control Circuitry
- Ice Thickness Probe (Initiates Harvest)
- Bin Level Probe
- Thermistors
- High Pressure Cutout (HPCO) Control
- Low Pressure Cutout (LPCO) Control
- Compressor Time Delay
- Fan Cycle Control
- Harvest Assist Air Pump
- Compressor Electrical Diagnostics
- Diagnosing Start Components
- Refrigeration Components
- Recovery/Evacuation/Charging Procedures QuietQube® Models
- System Contamination Clean-Up
- Total System Refrigerant Charge QuietQube® CVD Models
- Control Board, Display And Touchscreen
- Charts
- Diagrams
176 Part Number: 000015431 Rev 02 6/20
Severe System Contamination
1. Remove the refrigerant charge.
2. Remove the compressor and inspect the refrigeration
lines. If burnout deposits are found, install a new
harvest valve and TXV.
3. Wipe away any burnout deposits from suction and
discharge lines at compressor.
4. Sweep through the open system with dry nitrogen.
Important
Refrigerant sweeps are not recommended, as they
release refrigerant into the atmosphere.
5. Install a new compressor and new start components.
6. Install a suction line filter-drier with acid and moisture
removal capability. Place the filter drier as close to the
compressor as possible.
7. Install an access valve at the inlet of the suction line
drier.
8. Install a new liquid line drier.
Important
Dry nitrogen is recommended for this procedure. This
will prevent refrigerant release.