Specifications

Section 2 Installation Instructions
Part Number 000007647 06/11 9
Vinyl Tubing Connection
1. Remove the water trough.
A. Depress tabs on right and left side of the water
trough.
B. Allow front of water trough to drop as you pull
forward to disengage the rear pins.
2. Locate the water inlet tube on the right hand side
(see below) of the ice machine base. Directly to the
left of the tube there is a small plug that must be
removed. Press up on the plug until it is out.
3. Locate the plug and remove it from the ice machine.
4. Install Y connector through the hole in the ice
machine base. Connect the clear vinyl tubing to one
side of the Y branch, the other side is for the plug
removed in step 3.
Top View
Y-Connector
5. Determine the amount of tubing required in the
AuCS control box and cut off the excess tubing.
6. Slide the 3/8" hose clamp onto the tubing and
connect it to the fitting on the AuCSĀ®-SO pump.
Water Inlet
Tubing
Plug Location
Press up on
bottom of plug
to pop out
Route tubing
to this area
Insert Y
connector
with tubing
Connect
tubing
Install plug
removed in
Step 3
Into Base of
Ice Machine