Installation Guide
Table Of Contents
- General Information
- Installation
- Component Identification
- Maintenance
- Operation
- Blade Tower Brixing
- CEV Electronic Ice & Carbonation Control
- Flavor Magic Programming
- Flav’R-Pic External Programming
- Flav’R-Pic (FRP-250) Programming
- Flav’R-Pic (FRP-250) Brixing Procedure
- FlexTower Programming Modes
- Control Board Run or Dispense Mode
- The 6 Programming Modes on FlexTower Control Board
- To Access Programming Modes
- To Exit Programming Modes
- Manual Dispense Mode
- Timed Dispense Mode (Flavor Adder Dispensed)
- Water Calibration Mode
- Syrup Calibration Mode
- Touchpad Configuration Mode
- Touchpad LED Light Sequencing Mode (8 Selection Area Touchpad)
- Touchpad LED Light Sequencing Mode (4 Selection Area Touchpad)
- Adjustments
- Agitation Timer
- Troubleshooting
- Component Specifications
- Charts
- Diagrams
- Blade Tower Plumbing
- CEV-30i & CEV-30e Plumbing
- CEV-40i & CEV-40e Plumbing
- CT-6 Plumbing and Wiring
- CT-8 Plumbing and Wiring
- CF-1522 Plumbing
- DI-1522 Post-mix Plumbing
- DI-1522 Pre-mix Plumbing
- DI/DIL-2323 6 Valve Post-mix Plumbing
- DI/DIL-2323 8 Valve Post-mix Plumbing & Variety Valve
- DI/DIL-2323 10 Valve Post-mix Plumbing
- DI/DIL-2323 6 Valve Pre-mix Plumbing
- Flavor Magic Plumbing
- FRP-250 Plumbing Diagram
- FRP-250 & FRP-250SCI Tubing Layout
- FT-8 Plumbing
- FT-12 Plumbing
- FlexTower Water Recirculation Pump Flow
- FlexTower Water Chiller Flow
- MDH-302 12 Valve Plumbing
- MDH-402 16 Valve Plumbing
- MDH-402 20 Valve Plumbing
- S/SV150 6 Valve Diagram
- S/SV175 8 Valve Diagram
- S/SV200/250/SV-250QD 8 Valve Diagram
- S/SV200/250 10 Valve Diagram
- Flex Manifold Diagrams
- CEV Wiring
- CF Drop-In Series Wiring
- Drop-in Wiring
- Flavor Magic Wiring
- Flav’R-Pic (FRP-250) Wiring
- FlexTower Wiring
- MDH-302 & MDH-402 Wiring
- NGF-250 Wiring
- quickdraw Wiring
- S/SV/SVi Wiring
- Selectable Ice Wiring
64 Part Number STH14 9/10
BLADE TOWER
How to Disassemble Tower Components
NOTE: This tower consists of two (2) valves combined
as one (1) with a mixer block, mixer tube, and mixer.
One pre-mix valve (CMBECKER) and one (1) Flomatic
424 flow control base.
Tower and Valve Disassembly:
1. Remove tower housing cover by removing the
thumb screw on the side.
2. Turn OFF both shut-off valves on the flow control
base and remove pressure by pulling the
dispense handle to the ON position.
3. Remove the latch pin on the mixer block by
pulling straight up.
4. Unscrew the inside flange nut on the pre-mix
valve.
5. Remove the pre-mix valve and mixer tube out the
front of the tower.
6. Remove the 424 flow control base by lifting up on
its latch pin.
To reassemble follow these steps in reverse order.
Maintenance Schedule
Every
day
Dispensing
Valves
For the pre-mix dispensing
valve, run carbonated water
ONLY through the valve and
dispense nozzle for 10
seconds. Turn syrup shut OFF,
and block the dispense nozzle
base with a clean new napkin.
Dispense carbonated water
only for a few seconds to fully
fill the dispense nozzle. Then
unblock the dispense nozzle
and flow carbonated water for
10 seconds. Wipe external
nozzle surfaces with
carbonated water, then turn
syrup shut off, ON. Clean other
nearby surfaces with
carbonated water or cleaning
solution.
STH14.book Page 64 Thursday, September 23, 2010 3:35 PM