Installation Guide
Table Of Contents
- General Information
- Installation
- Component Identification
- Maintenance
- Operation
- Blade Tower Brixing
- CEV Electronic Ice & Carbonation Control
- Flavor Magic Programming
- Flav’R-Pic External Programming
- Flav’R-Pic (FRP-250) Programming
- Flav’R-Pic (FRP-250) Brixing Procedure
- FlexTower Programming Modes
- Control Board Run or Dispense Mode
- The 6 Programming Modes on FlexTower Control Board
- To Access Programming Modes
- To Exit Programming Modes
- Manual Dispense Mode
- Timed Dispense Mode (Flavor Adder Dispensed)
- Water Calibration Mode
- Syrup Calibration Mode
- Touchpad Configuration Mode
- Touchpad LED Light Sequencing Mode (8 Selection Area Touchpad)
- Touchpad LED Light Sequencing Mode (4 Selection Area Touchpad)
- Adjustments
- Agitation Timer
- Troubleshooting
- Component Specifications
- Charts
- Diagrams
- Blade Tower Plumbing
- CEV-30i & CEV-30e Plumbing
- CEV-40i & CEV-40e Plumbing
- CT-6 Plumbing and Wiring
- CT-8 Plumbing and Wiring
- CF-1522 Plumbing
- DI-1522 Post-mix Plumbing
- DI-1522 Pre-mix Plumbing
- DI/DIL-2323 6 Valve Post-mix Plumbing
- DI/DIL-2323 8 Valve Post-mix Plumbing & Variety Valve
- DI/DIL-2323 10 Valve Post-mix Plumbing
- DI/DIL-2323 6 Valve Pre-mix Plumbing
- Flavor Magic Plumbing
- FRP-250 Plumbing Diagram
- FRP-250 & FRP-250SCI Tubing Layout
- FT-8 Plumbing
- FT-12 Plumbing
- FlexTower Water Recirculation Pump Flow
- FlexTower Water Chiller Flow
- MDH-302 12 Valve Plumbing
- MDH-402 16 Valve Plumbing
- MDH-402 20 Valve Plumbing
- S/SV150 6 Valve Diagram
- S/SV175 8 Valve Diagram
- S/SV200/250/SV-250QD 8 Valve Diagram
- S/SV200/250 10 Valve Diagram
- Flex Manifold Diagrams
- CEV Wiring
- CF Drop-In Series Wiring
- Drop-in Wiring
- Flavor Magic Wiring
- Flav’R-Pic (FRP-250) Wiring
- FlexTower Wiring
- MDH-302 & MDH-402 Wiring
- NGF-250 Wiring
- quickdraw Wiring
- S/SV/SVi Wiring
- Selectable Ice Wiring
Part Number STH14 9/10 143
Pump Deck Wiring
The supply cord is equipped with a three prong 5-15P.
When a Ground Fault Circuit Interrupter (GFCI) is
required by code, a breaker type protector must be
used. We do not recommend GFIC outlets as they are
known for more intermittent nuisance trips than panel
breakers. To ensure both the safety and proper
operation of this equipment, be certain that the
electrical receptacle is a proper design so as to accept
this plug, ensuring that the carbonator assembly is
properly grounded.
If the pump deck is to be installed in an area or
community whose local codes require permanent
wiring, the following procedure must be followed.
1. The three wires (white, black and green) must be
fed through the cable connector and brought into
the wiring compartment. The cable must be
secured into the connector.
2. The green wire from the cable must be connected
to the green screw that attaches to the inside
panel of the wiring compartment. Be sure to use a
ring torque terminal for connecting the wire to the
screw.
3. The white wire from the cable must be joined to
the N terminal of the liquid level control board by a
suitable U.L. listed insulated cable connector.
The black wire from the cable must be joined to the L1
terminal of the liquid level control board by a suitable
U.L. listed insulated cable connector.
STH14.book Page 143 Thursday, September 23, 2010 3:35 PM