Installation Guide
Table Of Contents
- General Information
- Installation
- Component Identification
- Maintenance
- Operation
- Blade Tower Brixing
- CEV Electronic Ice & Carbonation Control
- Flavor Magic Programming
- Flav’R-Pic External Programming
- Flav’R-Pic (FRP-250) Programming
- Flav’R-Pic (FRP-250) Brixing Procedure
- FlexTower Programming Modes
- Control Board Run or Dispense Mode
- The 6 Programming Modes on FlexTower Control Board
- To Access Programming Modes
- To Exit Programming Modes
- Manual Dispense Mode
- Timed Dispense Mode (Flavor Adder Dispensed)
- Water Calibration Mode
- Syrup Calibration Mode
- Touchpad Configuration Mode
- Touchpad LED Light Sequencing Mode (8 Selection Area Touchpad)
- Touchpad LED Light Sequencing Mode (4 Selection Area Touchpad)
- Adjustments
- Agitation Timer
- Troubleshooting
- Component Specifications
- Charts
- Diagrams
- Blade Tower Plumbing
- CEV-30i & CEV-30e Plumbing
- CEV-40i & CEV-40e Plumbing
- CT-6 Plumbing and Wiring
- CT-8 Plumbing and Wiring
- CF-1522 Plumbing
- DI-1522 Post-mix Plumbing
- DI-1522 Pre-mix Plumbing
- DI/DIL-2323 6 Valve Post-mix Plumbing
- DI/DIL-2323 8 Valve Post-mix Plumbing & Variety Valve
- DI/DIL-2323 10 Valve Post-mix Plumbing
- DI/DIL-2323 6 Valve Pre-mix Plumbing
- Flavor Magic Plumbing
- FRP-250 Plumbing Diagram
- FRP-250 & FRP-250SCI Tubing Layout
- FT-8 Plumbing
- FT-12 Plumbing
- FlexTower Water Recirculation Pump Flow
- FlexTower Water Chiller Flow
- MDH-302 12 Valve Plumbing
- MDH-402 16 Valve Plumbing
- MDH-402 20 Valve Plumbing
- S/SV150 6 Valve Diagram
- S/SV175 8 Valve Diagram
- S/SV200/250/SV-250QD 8 Valve Diagram
- S/SV200/250 10 Valve Diagram
- Flex Manifold Diagrams
- CEV Wiring
- CF Drop-In Series Wiring
- Drop-in Wiring
- Flavor Magic Wiring
- Flav’R-Pic (FRP-250) Wiring
- FlexTower Wiring
- MDH-302 & MDH-402 Wiring
- NGF-250 Wiring
- quickdraw Wiring
- S/SV/SVi Wiring
- Selectable Ice Wiring
Part Number STH14 9/10 137
Liquid Level Control
END
START
Does
Pump
motor
come on?
Remove red
and black
wires from
LLC.
Is pump
motor
operation
intermittent
?
Does
pump
motor
come
on?
Black and/or red probe
shorted. Remove
probes, straighten or
replace if necessary.
Short “H” and
“C” terminals
on LLC.
Does
the
pump
motor
shut
off?
Measure AC
voltage
across load
terminals on
LLC.
Check pump
motor and
wiring.
Check probe
harness, harness
connections and
water supply.
Is line
voltage
(± 10%)
present
?
Replace
LLC
START
Does
Pump
motor
come
on?
Remove red
and black
wires from
LLC.
Is pump
motor
operation
intermittent
?
Black and/or red probe
shorted. Remove
proves, straighten or
replace if necessary.
Does
pump
motor
come
on?
Short “H” and
“C” terminals
on LLC.
Measure AC
voltage
across load
terminals on
LLC.
Does
the
pump
motor
shut
off?
Check probe
harness, harness
connections and
water supply.
Is line
voltage
(±10%)
present
?
Check pump
motor and
wiring.
Replace
LLC.
END
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
STH14.book Page 137 Thursday, September 23, 2010 3:35 PM