Manual

MALONE
R
Installation & Loading Instructions - Please Read Before Beginning
12’ Bow & Stern LinesJawz Universal Adapters Mounting Bolts
40mm
50mm
Stax Pro Kayak Carrier 12’ Load Straps
Cogs
1
2
3
STAX PROSTAX PRO
TM
VERTICAL FOLD-DOWN KAYAK CARRIER
. Insert a 100mm Bolt into the square
hole located in the top of the Base.
See image 2.
Step 1: Assembling the Stax Pro
. Insert the bottom of the Post into the
top of the Base. Position so the cogs
on the Post are in contact with the
cogs on the Base. See image 1.
. With the holes in the Base and Post aligned,
push the bolt through the two assemblies
until the end of the bolt is exposed.
Note: Confirm that the head of the bolt is
fully seated in the Base. See image 3.
TM
Foam Blocks

Summary of content (7 pages)