Installation Guide

32 / 41
8-2 Switch box section
Dont put any Lead wires on
these Ribs.
Switch plate complete
Put Connector under Relay cord for
Switch box.
Relay cord for Switch box
Rib
Pass Lead wires in this groove.
Assemble area A
to touched to Rib.
A
Assemble Flag receptacle as shown
above.
Switch plate complete
Dont put Connector so that Lead
wire of Switch plate complete
faces to Switch terminal side.
Switch terminal
Connector of Switch
plate complete
NG
Lever
Note for assembling Switch
Before start to repair, set Lever <1>
or <2>.
<1>
<2>
Switch