Operation Manual

21
LEVELING THE BUILD PLATE CONTINUED
C STARTUP PROCESS: LEVELING, LOADING, TESTING
Leveling
Knobs
Support
Card
When directed by the LCD screen, tighten
each of the three knobs under the build
platform about four turns.
1
Make Some Room Between the Build Plate and the Nozzle
®
MB2020_REP2_UserManual_V4.indd 21 7/22/13 5:32 PM