User Manual

27D7300
8
VWF Series Vented Gas Log Set
The Safety Pilot Kit attaches to the burner pan as shown
above.
Use soapy water when checking all ttings for leaks.
SUPPLEMENTAL INSTRUCTIONS FOR SPK-
NGA/SPK-LPA
Adjust pilot ame to cover
thermocouple
INSTALLATION FOR GAS VALVE KITS
SPK-NGA Kit Includes
Valve
Pilot (Congured for NG)
Pipe Nipple
Heat Shield
Knob Extenders
SPK-LPA Kit Includes
Valve
Pilot (Congured for LP)
Air Mixing Nut
Brass Nut
Heat Shield
Knob Extenders
WARNING
LP sets must be installed with a SPK or
MVVKLP Kit which includes the air mixing
nut and vermiculite. The natural gas orice
must be removed.
FP2729
natural valve connect
Burner Fitting
Reducer
Natural Gas
Injector
Pipe Nipple
Gas Control
Valve
FP2729



FP2730
LP valve connect
Burner Fitting
Brass Nut
LP Air-Mixing
Injector
Gas Control
Valve
FP2730


