Installation Instructions
40
Majestic • RUBY25IN, RUBY25IL, RUBY30IN, RUBY30IL, RUBY35IN, RUBY35IL Installation Manual • 2542-980 Rev. i • 9/19
Figure 8. Log #6
LOG #3: With the burnout area facing right, place the back end of log #3 on the left at spot of Log #1. The front end will
sit on the base pan and line up with edge of the base refractory. The front end of the log will sit about ¼” from the left wall
of the rebox. See Figure 5.
Figure 5. Log #3 Installed
Figure 7. Log #5 Installed
LOG #4: The burnout area of the log will face left. Place the big end of log #4 centered against log pin D and the small end
on the at spot of Log #1. See Figure 6.
LOG #5: With the bark side of log #5 facing right, place the small end of Log #5 on the at spot of Log #4. The big end of
log #5 will line up with the front edge of the refractory embers and sit just to the left of the grout line. See Figure 7.
Figure 6. Log #4 Installed
Figure 9. Log #6 Installed
LOG #6: With bark side of log facing right, place Log #6 onto Log #2. The point of the big end of Log #6 will line up with
the front edge of the base refractory embers. The bark corner of log #6 will sit about 1.5” from Log #5. See Figures 8 & 9.
Figure 10. Log #7 Installed
5
6
6
2
LOG #7: With bark side facing left, place the small end of Log #7 on the at spot of Log #2. Place the large end of Log #7
on the at spot of Log #1. See Figure 10.
7
2
1
2
1
3
1
4
D
1/4"
5
4










