Installation Manuel

23
Hearth & Home Technologies • Power Vent Inline (PVI-SLP) Instructions • 2196-900 Rev. AC • 12/15
11 INCH X 16 INCH
ACCESS PANEL
Figure 5.5 Maintenance Access
Figure 5.3 Baf e Adjustment Location
ADJUSTMENT BOLT
INDICATOR BAR
INDICATOR BAR
ADJUSTMENT HOLES
Figure 5.4 Baf e Adjustment
D. Operating Instructions
After installation of the power vent, follow the operation
instructions of the replace.
1. Turn the replace ON/OFF switch to "ON".
Note: During periods of operation after turning the
replace "ON", there will be a delay before the replace
ignites. This is due to the time necessary for the fan to
reach operating speed and to remove any gases from the
combustion chamber.
2. After turning the switch to the "ON" position, if the re-
place does not turn on, shut the switch to "OFF" and
inspect the power vent system for any debris that may
be obstructing the fan blade movement.
3. Turn the replace ON/OFF switch to "OFF" to turn off
the burner and the power vent.
SCREWS (3)
NUTS (5)
E. Maintenance
WARNING! Risk of Shock! Before performing any main-
tenance or repair to the power vent assembly, make sure
electrical power is disconnected to the replace.
1. Vent System: Inspect all components and connections
annually. Replace, seal, or tighten pipe connections if
necessary.
2. Access Panel: Inspect at least annually. Ensure mesh
is free of dust and debris.
3. Motor: The fan motor bearings are sealed and no further
lubrication is necessary. To access the motor, vacuum
switch or pressure sense tube, refer to Figure 5.5.
If the motor needs to be removed, take out the three screws
that attach the collar to the wall and the ve nuts holding
the motor down as shown in Figure 5.6.
Figure 5.6 Motor/Blower Service
Distance from PVI-SLP to
Appliance
Maximum Allowable
Baf e Setting
2-15 ft. 3 holes visible
16-39 ft. 2 holes visible
Greater than 40 1 hole visible
Table 3.