Installation and Operation
9
26D4720
MCUF Series Vent-Free Firebox
Firebox framing can be built before or after the appliance
is set in place. Construct rebox framing following Figure
1. Refer to Figure 1 on Page 6 for rebox dimensions. The
framing headers may rest on the top of the rebox.
The rebox may be installed directly on a combustible oor
or raised on a platform of an appropriate height. When
the rebox is installed directly on carpeting, tile, or other
combustible material, other than wood ooring, the rebox
shall be installed on a metal or wood panel extending the
full width and depth of the enclosure.
Combustibles may not come any closer to the top of the
enclosure than the standoffs will allow.
1. Bend out the nailing anges located on each side of the
rebox.
2. Slide the rebox into prepared framing or position rebox
in its nal position and frame later.
3. Level the rebox by checking the top edge of the rebox.
Shim if necessary.
4. Anchor rebox to the side framing members using 8d
nails or other suitable fasteners. Figure 9
5. The canopy must be installed for safe operation of
the heater. Refer to Page 11 for canopy installation
details.
FP2693
nailing flanges
Nail Sides
Through
Nailing
Flanges
FP2693
Figure 9 -
Side Nailing Flanges
When nishing a custom cabinet, mantel, or other built-in
enclosure, the opening size to accommodate the replace
with trim installed is as follows:
A 42" 47C\v"
B 38Z\," 38Z\,"
A
B
FP2694
custom cabinet
FP2694
Figure 10 -
Custom Cabinet