Use and Care Manual
Table Of Contents
Maincraft
Page 4
B
INSTALLATION PROCEDURES
Remark
This installation instruction may suitable for any of top mount basin or
vessel
Top mount
INSTALLATION INSTRUCTIONS
HELPFUL TOOLS
Pencil
Impact Drill
Adjustable Wrench
Screwdriver
Tape Measure
Cutting machine
Supply Shut-Off Valve
CSJ
Neutral Mildew Resistant
Silicone Sealant
Teflon Tape
Place the basin on the counter, and
determine the installation positions for
the faucet and basin according to the
installation requirements for the
supporting faucet
Mark the faucet and basin at the determined
installation positions with a pencil, use the
cutting machine or electric drill to make
holes, and then sand the edge of the holes.
Install the faucet and its components.
Apply mildew-proof neutral glass cement on
the contact area of the basin bottom part and
counter, place the basin properly on the
surface, and then firmly press it (let it dry for
24 hours).
Install a lever faucet to the basin.
Connect the water supply pipe to the faucet, and
carefully bend the pipe to make it match the
water supply shut-off valve. Ensure the pipe is
sealed. (Always wash the sediments in the
water supply pipe away before connecting the
shut-off valve.)