user manual

117. Connect the remaining end of the 11/
32” barb located on the driver side of the inlet
manifold as shown.
11/32” Hose
118. Using a shop knife cut the plastic tubing
on the original PCV lines to free the plastic end
ttings.
119. Connect the 90 degree PCV ttings to a 18”
length of 5/8” PVC hose supplied as shown.
120. Connect one end of the new 18” PCV line to
the driver side valve cover barb. Route the hose
under the P/S uid reservoir bracket toward the
front of the vehicle.
P/S Reservoir
Bracket
PCV Hose w/
Fitting
05/06
Page 32
2004-2006 Ford F-150 3V Supercharger Installation Instructions magnacharger.com