Specifications
LIGHT TOWER START UP
Before starting the light tower, carefully read the pre-start check list. Make sure that all of the items are checked
before trying to start the light tower. This check list applies for both manual and remote starting.
PRE- START CHECK LIST
Make sure the control ON/OFF toggle switch is in the OFF “O” position.
Make sure that the circuit breakers (main and convenience) are switched OFF “O”.
Check that the light tower is properly grounded to a good earthen ground per any local and NEC
regulations.
Check all electrical connections at the connection lugs. Are they wired correctly?
Are the connection lugs tight?
Check that the voltage selector switch is set to the desired voltage.
Is the voltage selector switch locked?
Is the light tower sitting level?
Check for any water inside, on, or near the unit. Dry the unit before starting.
Check oil, coolant and fuel levels and engine battery connections.
Check engine fan belt tension and condition.
Check engine fan belt guard.
Check engine exhaust system for loose or rusted components.
Check radiator and surrounding shroud for debris.
Are any of the generator covers loose or missing?
Are all preventative maintenance procedures up to date?
Check that the battery disconnect switch is on, if equipped.
MANUAL STARTING OF THE LIGHT TOWER
1. Move the control ON/OFF toggle switch to the “CONTROL ON / I” position.
2. The Liquid Crystal Display (LCD) window will quickly display system information, all Light Emitting
Diodes (LED’s) will flash.
3. The LCD window will indicate MANUAL mode and Ready. The Ready/Manual LED will be lit. Note: The
unit must be in the “MAN” Mode with the Ready/Manual LED lit to start the unit.
28