Installation Instructions

1: Removing old vanity (if applicable): 1) Turn o󰀨 the water supply and take
the drain out.
2) Disconnect the supply lines from the faucet. 3) Remove the old vanity
top and vanity. NOTE: If the new vanity is not installed immediately,
temporarily stu󰀨 a rag into the drain pipe.
2: Using a level, locate any uneven oor and/or wall areas where your
vanity will be installed. Unevenness can cause your vanity to become
misaligned resulting in twisting of the cabinet. Repair any uneven areas
by reducing high spots or shimming low spots.
3: 1) Place the vanity in the desired position taking into account the
location of your plumbing. 2) Ensure the vanity is level front to back and at
both sides.
4: Secure the vanity to the wall by inserting (x 2) #8 x 2” screws
(B - not included) through the back rail of the vanity. Figure 1. NOTE: It
is recommended that the vanity be installed to at least one wall stud. If
you are unable to locate wall studs, it is recommended that you use wall
anchors (C - not included) to secure the vanity. 5: Install the hardware,
vanity top, faucet and drain (each not included) as per the instruction
sheets provided with those items and ensure that there is no leakage.
TROUBLESHOOTING
WARNINGS & CAUTIONS
WARNING:
Two people are required for safe installation. Take extra precautionary
measures to ensure a secure grip on the vanity base when lifting.
CAUTION:
The bathroom oor and wall must be nished prior to
installation of the vanity base.
INSTALLATION Model 30003 shown in illustration
Figure 1
Problem:
1) Vanity doors or drawers rub against
another surface.
2) There is an uneven gap between
the doors or drawers and cabinet.
Possible Cause:
Floor or vanity is not level.
Corrective Action:
1) Use a shim to ensure the vanity is
level.
2) Adjust the door hinges or drawer
slides. Figures 2 and 3.
CARE & MAINTENANCE
• To maintain the beauty of the furniture nish, avoid placing the vanity in direct sunlight.
Avoid exposing the vanity to extreme temperatures by installing away from heat and air vents.
• Dust frequently with a clean, soft and dry cloth.
• Wipe away any water or liquid spills on the vanity base immediately with a clean, soft and dry cloth.
Tools required for assembly (not included):
• tape measure
• electric drill with #2 drill bit (A)
• level
• (x 2) #8 x 2” screws (B)
• (x 2) wall anchors - if the vanity will not be screwed to wall studs (C)
Estimated installation time: 2-1/2 hours (including removal of old vanity if applicable)
PREPARATION