Installation Instructions
Tools required for assembly (not included):
• electric drill with #2 drill bit (A)
• (x6) #4 x 3/4” screws (B)
• (x3) L-brackets (C)
Estimated installation time: 10 minutes
PREPARATION
INSTALLATION -
For all Elements collections: product images are for reference only
PACKAGE CONTENTS
CARE & MAINTENANCE
• To maintain the beauty of the furniture nish, avoid placing the cabinet in direct sunlight.
• Avoid exposing the cabinet to extreme temperatures by installing away from heat and air vents.
• Dust frequently with a clean, soft and dry cloth.
• Wipe away any water or liquid spills on the cabinet immediately with a clean, soft and dry cloth.
Filler strip (x1)
Questions? Call our customer service department at
1-855-995-5578, 8:30 a.m. - 5 p.m., EST, Monday - Friday
or e-mail: contactus@magickwoods.com.
FILLER STRIP
INSTALLATION INSTRUCTIONS
If installing between a vanity base and a wall:
1) Attach the (x3) L-brackets (C - not included) to the ller strip as shown in gure 1, using (x3) #4 x 3/4” screws (B - not included).
2) Place the ller strip on the side of the vanity base that meets the wall, aligned with the front edge of the vanity base (or set back as
desired), as shown in gure 2.
3) Secure the ller strip to the side of the vanity base by inserting (x3) #4 x 3/4” screws (B - not included) through the L-bracket holes into
the cabinet, as shown in gure 2.
4) Secure the vanity base to the wall, following the installation instructions provided with the cabinet.
If installing between a vanity base and a linen cabinet:
1) Attach the (x3) L-brackets (C - not included) to the ller strip as shown in gure 1, using (x3) #4 x 3/4” screws (B - not included).
2) Place the ller strip on the side of the vanity base, aligned with the front edge of the vanity base (or set back as desired), as shown in
gure 2.
3) Secure the ller strip to the side of the vanity base by inserting (x3) #4 x 3/4” screws (B - not included) through the L-bracket holes into
the cabinet, as shown in gure 2.
4) Secure the vanity base to the wall, following the installation instructions provided with the cabinet.
5) Place the linen cabinet against the wall, with its side ush against the open side of the ller strip.
6) Secure the linen cabinet to the wall, following the installation instructions provided with the cabinet.
Figure 1
Figure 2. Applies to all Elements
collections. Brighton model illustrated.