Specifications
76
The previous example resulted in a very simple network de-
sign. The figure below represents a more complex control sur-
vey where 10 new points are to be established based on 2
existing horizontal and 3 existing vertical control points.
Again, if you were to perform this survey with a conventional
total station, you would design a traverse plan which produced
a strong looking network of closed-loop traverses through the
points of the survey. The figure below shows one possible net
-
work design.
Although this network design was produced with conventional
traversing in mind, this same design can also be used if per
-
forming the survey with GPS equipment.
15-Point Control Survey
Example
Network Design for 15-
Point Control Survey