Product Overview
Electric Operators
- VA Series
Tunstall Corporation
118 Exchange Street • Chicopee, MA 01013
© July 2015
We reserve the right to alter designs, specifications and information without notice.
Phone (413) 594-8695 · Fax (413) 598-8109
www.tunstall-inc.com • www.maconcontrols.com
Section: Electric Operators Bulletin-MC-VA-1015
Installation Orientation
The Macon VAC and VAO must be installed preferably
in vertical or horizontal position (A, B, & C).
For “overhead” installation (D) special circumstances
(e.g. drain water) can reduce the lifetime of the actuator.
A
B
C
D
Wiring Diagram
ELECTRIC
OPERATORS
Cut-A-Way View
1. Transparent Zone
2. Sensor
3. Spring
4. Electrical Micro switch (4 wire)
5. Cable Connector
6. Ring Nut


