User Manual

Table Of Contents
SECTION 6 OPERATION
169000 74 Revision F
6.17.4.4 Auger Vertical Adjustment: A40-D
a. Open LH endshield.
b. Loosen four nuts (E).
c. Loosen jam nuts on adjuster bolts (F), and turn
bolts (F) to adjust auger vertical position.
d. Tighten jam nuts.
e. Tighten nuts (E).
f. Open RH endshield.
g. Loosen four nuts (G).
h. Loosen jam nuts on adjuster bolts (H), and turn
bolts (H) to adjust auger vertical position.
i. Tighten jam nuts.
j. Tighten nuts (G).
k. Close shields before engaging header.
E
F
G
H