User Manual
  SECTION 7 MAINTENANCE AND SERVICING 
169000 / 169040  170  Revision E 
j. 
j.  Remove three flanged lock nuts (M) that secure 
gearbox (N) to header endsheet, and remove 
gearbox. 
7.13.13  Gearbox Installation: A40-D 
a.  Position gearbox (N) (as shown above) picking 
up the three holes in the endsheet. 
b.  Install three flanged locknuts (M), but do not
tighten. 
c.  Position channel (L), picking up the three holes 
in the endsheet. 
d.  Install bolts at (J) in the lower two holes, and bolt 
and nut (K) in the upper hole, and tighten. 
e. Tighten hardware. 
f.  Install drive pulley (G) as follows: 
1.  Slide pulley (G) onto shaft with key. 
2.  Install tapered bushing (H) onto the shaft, 
ensuring holes are aligned with holes in 
pulley. 
3.  Align faces of pulley (G) and countershaft 
pulley (O) to within .06 in. (1.5 mm). 
4.  Install three bolts in tapered bushing (H), 
and tighten to 18 ft·lbf (25 N·m). 
5.  Tap bushing and re-torque. Repeat until 
bolts no longer turn at 18 ft·lbf (25 N·m). 
g.  Position belts (F) on pulleys (G) and (O). 
h.  Turn adjuster bolt (E) to move pulley (G) until a 
force of 8–12 lbf (35–50 N) on each belt at  
mid-span deflects the belt (F) 0.16 in. (4 mm). 
i.  Tighten jam nut at (E), and three nuts (D). 
j.  Slide upper roll driveline onto gearbox as shown. 
Install and tighten two bolts and nuts (S).  
Torque to 75 ft·lbf (102 N·m). 
k.  Attach lower roll driveline flange onto gearbox 
flange using four bolts and nuts (T). 
(continued next page) 
J 
L 
K 
G
H
F
D 
E
O
T
S 
T
M 
N 










