Instruction Manual

39
MAINTENANCE/SERVICE
GREASING THE HEADER
(continued)
50 Hours
1. Reel Support Bushing (F) -
one fitting (two on 36 ft.)
100 Hours or Annually
1. Sickle Drive Shaft Support Bearings (C) -
two fittings
2. Gauge Wheel Pivot Bushings (H) - one fitting
3. Split Reel Connector Block (N)
- one fitting on 36’ headers
N
SPLIT REEL CONNECTOR – 36’
GAUGE WHEEL PIVOT BUSHINGS
H
REEL SUPPORT BUSHING
F
SICKLE DRIVE SHAFT SUPPORT BEARINGS
C
C