User Manual

Form # 46290 Issue 09/05
78
MAINTENANCE RECORD
Header Serial No.___________________ Hay Conditioner Serial No._________________
Combine this record with Windrower or Combine Maintenance Record for "complete unit" service.
See Maintenance/Service section for details on each procedure. Copy this page to continue record.
(C) – Combine Applications (D) – Double Sickle Headers (O) – Optional Equipment
ACTION: 9 - Check 6 - Lubricate S - Change
Hour Meter
Reading:
Serviced By:
Maintenance
Procedure
BREAK-IN See “Break-In Period” in Operation section for checklist.
10 HOURS OR DAILY
6
Secondary Driveline (C)
9
Sections, Guards, Hold-downs
6
Sickle Assembly
9
Hydraulic Hoses and Lines
9
Tire Pressure (O)
6
Hay Cond. Drive Chain (O)
25 HOURS
6
Sickle Head
50 HOURS
6
CrossShaft Center Supp. (D)
6
P.U. Reel Support (30&36’)
6
Conditioner Roll Bearings (O)
6
Cond. Belt Idler Pulley Brg. (O)
100 HOURS OR ANNUALLY
6
Draper Roller Bearings
6
Reel Drive Support Bearings
6
Pick-Up Reel Drive Cam
6
Reel Tail Support Bearing
6
Split Reel Connector Block
6
Sickle Drive Shaft Bearings
6
CrossShaft End Bearings (D)
9
Sickle Drive Belt Tension
9
Wobble Box Bolts & Lube
9
Reel Drive Chain Tension
6
Reel Drive Chain
9
Cond. Drive Chain Tension (O)
6
Gauge Roller Bearings (O)
6
Upper Cross Auger Brg. (O)
9
Gauge Wheel Bolt Torque (O)
6
Gauge Wheel Pivot Bush. (O)
500 HOURS OR ANNUALLY
6
Gauge Wheel Hub Brgs. (O)
1000 HOURS OR 3 YEARS
S
Wobble Box Lubricant