Installation manual

IP DECT Installation Page 37
15-601085 Issue 04f (11 June 2009)IP Office
Base Station Installation: Using IP Office DHCP
12.Depending on which application is performing TFTP, it should show the base stations requesting and downloading
their application software.
13.The LED or LED's on the base stations should show their status. Check these. Power cycle the base stations if
necessary to restart them.
· RED On
Wait for link up.
· RED Flashing 0.5 Hz
Launching a DHCP request and waiting for a DHCP offer.
· RED Flashing 2.5 Hz
Downloading the application image.
· ORANGE On
Launching DHCP request and waiting for DHCP reply.
· GREEN Flashing 0.5 Hz
IP Base Station initialising its internal components.
· GREEN Flashing 1 Hz
IP Base Station trying to connect to ADMM.
· GREEN Flashing 2 seconds On, 0.5 seconds Off
Attempting configuration and DECT synchronization.
· GREEN On
IP Base Station is up and running.
14.Proceed to ADMM Setup .
40