Technical Specifications
Build a structure based on the dimensions in the chart
below.
106011
Between
48"- 48 1/4"
33 1/2"
min.
16" 24"
106012
Between
60"- 60 1/4"
33 1/2"
min.
16" 8 1/2"
Verify the wall studs are square, plumb and the
ooring is perfectly level.
6"
6"
C
For leveling the oor use self-leveling
mortar.
Cut out an approximate 6" x 6" opening around
the drain center outlined by measurements C and
D. See image to the right and the chart above. We
recommend that a plumber completes the drain pipe
connection.
A
B
C
D
6"
A
B
C
D
6"
A
B
C
D
6"
A
B
C
D
Top view os structure
Leveling the oor is
critical for wall alignment
1.1
Check me!
1.2
Check me!
1.3
Check me!
D
1
STEP Building the structure