Installation Instructions

3 10014428
1. Measure along the top of bathtub at
back and end walls.
2. Mark the center of the back wall on the
wall and on the bathtub ledge. Mark the
center of the back panel (B).
3. Trial install all panels with masking tape
as illustrated in.
a) Place one end panel (C) on the wall
opposite the plumbing end, resting on
the bathtub ledge and within 3 mm
(1/8") of the front edge of the bathtub.
b) Cut a cardboard template from the
packing carton to the correct height and
width for the end panel (A), which will
have the plumbing fixtures.
c) Mark one side of the template with an
«» and position the template (within
3 mm of the front edge of the bathtub)
with the «» side against the bathtub
end wall with the exposed plumbing.
. Mark the position of the faucet
handles, bathtub spout and shower arm
on the template. Check for accuracy
and cut.
1. Prendre les mesures des murs du fond
et des deux côtés.
2. Tirer un trait vertical au crayon au
centre du mur du fond et sur le rebord
avant de la baignoire. Marquer le centre
du panneau de fond (B).
3. Installer provisoirement les panneaux
avec du ruban à masquer, tel qu’illustré
à la .
a) Poser le panneau de (C) sur le mur
opposé à la robinetterie, à 3 mm (1/8 po)
du rebord avant de la baignoire, l’extrémité
inférieur du panneau reposant sur le rebord
de la baignoire.
b) Découper, dans le carton d’emballage, un
gabarit correspondant aux dimensions du
panneau latéral (A) sur lequel se trouvera
la robinetterie.
c) Marquer d’un «» le du gabarit
touchant le mur. Placer le gabarit 3 mm
du rebord avant de la baignoire) contre le
mur contenant la tuyauterie. Marquer la
place des tuyaux, de la robinetterie et de
la douche et percer les trous nécessaires
sur le gabarit. . Replacer le gabarit
sur le mur pour vérifier I’emplacement des
trous et couper.
1. Tome las medidas de los muros del
fondo y de ambos lados.
2. Realice un trazo vertical con lápiz en
el centro del muro del fondo y sobre el
reborde delantero de la bañera. Marque
el centro del panel del fondo (B).
3. Instale provisionalmente los paneles
con cinta adhesiva protectora, tal como
se muestra en la .
a) Coloque uno de los paneles del extremo
(C) sobre el muro opuesto a la grifea, a
3 mm (1/8") del reborde delantero de la
bera, asentando el reborde inferior del
panel sobre el reborde de la bañera.
b) Utilizando la caja de cartón, recorte
una plantilla que corresponda a las
dimensiones del panel lateral (A) sobre
el cual se ubicará la grifería.
c) Marque con una el lado de la plantilla
que hace contacto con el muro. Coloque
la plantilla (a 3 mm del reborde delantero
de la bañera) contra el muro que contiene
la tubería. Marque el lugar de los tubos,
la grifería y la ducha y perfore los orificios
necesarios sobre la plantilla (). Vuelva
a colocar la plantilla sobre el muro para
verificar la ubicación de los orificios y cortar.




Electric or hand drill
Hole saw (optional)
Measuring Tape
Level
Square
Grease Pencil ()
Caulking Gun
60" Straight Edge
Masking Tape
Sharp Cutting Tool
Mineral spirits (Paint thinner) No Lacquer
Thinner or Acetone
1 Cartridge of Siliconized Latex Caulking*
2 Cartridges of Wall Adhesive, Polystyrene
or ABS Compatible (3 cartridges are required
for 80" tubwall kits)
2 Soft clean cloths
Plastic and laminate cutter (optional)
Serrated Spreader

     

    

     

Perceuse électrique ou manuelle
Scie-emporte-pièce (facultatif)
Ruban à mesurer
Niveau
Équerre
Crayon gras ()
Pistolet à calfeutrer
Règle droite de 60 po
Ruban à masquer
Couteau utilitaire
Essence minérale (diluant à peinture)
(pas de diluant pour laque ni d’acétone)
1 cartouche de calfeutrant à base de latex*
2 cartouches d’adhésif à polystyrène ou à
ABS (3 cartouches sont nécessaires pour
les contours de 80 po de hauteur)
2 chiffons propres et doux
Couteau de découpe pour plastiques et
stratifiés (falcutatif)
Truelle crantée

     

    
    



Taladro eléctrico o manual
Sierra caladora (opcional)
Cinta mética
Nivel
Escuadra
Lápiz ()
Pistola de sellado
Regla recta de 60"
Cinta adhesiva
Cuchillo pequeño
Alcohol mineral (diluyente para pintura),
y no diluyente para laca ni acetona
1 cartucho de calafateo a base de látex*
2 cartuchos de adhesivo de poliestireno o
con ABS (se necesitan 3 cartuchos para las
paredes de 80" de altura)
2 trapos limpios y suaves
Cuchillo para plástico y laminado (opcional)
Llana dentada

      



    
