Instruction manual

160GR Natural Gas Booster Instruction Manual
Mayekawa all rights reserved. Subject to change without notice. Lat revised in October 2007 p.9
・Vi Changing Procedures < From L-Port to M-Port >
① The position L-Port
② Remove the Variable Vi guide pin from the
bottom of the suction cover.
③ Turn the capacity control handle 4 7/8 times
in counter-clockwise and remove the set
bolt from the bottom of the rotor casing.
Replace it with Variable Vi guide pin.
④ Screw the Variable Vi guide pin into the
bottom of the rotor casing. If it is tight, turn
the capacity control handle slightly in both
directions.
⑤ Lock the set bolt into the bottom of the
suction cover.
This completes the procedures for
changing to the M Port.