User manual
BA SC9840knx Anwendungsprogramm HM, DE GB - 23265 - ED - V02
INSTRUCTION MANUAL ENGLISH - PAGE 3 / 4
Parameter Channel A / B / C / D
Choices for „Function Channel A / B / C / D“ (separately adjustable for each channel):
Choice
Second choice
Possible input
Explanation
╚> none - - -
╚> Switch -
According to the time switch program* a switch-
bit with value “1” for ON respectively value “0” for OFF will
be sent to the bus.
╚> Priority
=> Priority channel on
=> Priority channel off
Priority
No priority
„Priority“ means that the receiver is forced to execute and keep the Priority value. All other 1 bit
(switching) objects sent to the addressed receiver will be stored but not executed until a “No priority”
finalizes the priority period. If “No priority” is sent to the receiver, a successive alterative communication
object will be executed be the receiver.
╚> Value 1 Byte
=> Value channel on
=> Value channel off
0 - 255
According to the time switch program* the configured value in the ETS (1 Byte) will be sent to the bus
when the time switch channel will be switched ON or OFF.*
╚> Value t Byte 2 Byte
=> Value channel on
=> Value channel off
0 - 65535
According to the time switch program* the configured value in the ETS (2 Byte) will be sent to the bus
when the time switch channel will be switched ON or OFF.*
╚> Float 2 Byte
=> 2 Byte float channel on
=> 2 Byte float channel off
-671088,64 – 670760,96
According to the time switch program* the configured value in the ETS (Float 2 Byte) will be sent to the
bus when the time switch channel will be switched ON or OFF.*
╚> Float 4 Byte
=> 4 Byte float channel on
=> 4 Byte float channel off
IEEE 754
According to the time switch program* the configured value in the ETS (Float 4 Byte) will be sent to the
bus when the time switch channel will be switched ON or OFF.*
╚> Scene
=> Scene channel on
=> Scene channel off
1 - 64
According to the time switch program* the configured value in the ETS (Scene) will be sent to the bus
when the time switch channel will be switched ON or OFF.*
╚> HVAC
=> HVAC channel on
=> HVAC channel off
Auto
Comfort
Standby
Economy
Building Protection
According to the time switch program* the configured value in the ETS (Auto / Comfort / Standby /
Economy / Building Protection) will be sent to
the bus when the time switch channel will be switched ON
or OFF.*
╚> Percent
=> Percent channel on
=> Percent channel off
0 – 100%
According to the time switch program* the configured value in the ETS (Percent) will be sent to the bus
when the time switch channel will be switched ON or OFF.*
* The values for switching ON or OFF can be changed any time by bus communication objects. According to the time switch program the configured value in the ETS will be sent the bus when the time switch channel will be switched ON or OFF.
These are also valid for manual overrides / Please see
also the “random function”.
Choices „Random function channel A / B / C / D“ (separately adjustable for each channel):
Choice
Second choice
Possible input
Explanation
╚> none - - -
╚> Delay of switching time
=> Shortest delay time [min.]
=> Longest delay time [min.]
1 - 254
According to the delay time, which is parameterized in the ETS, the switching time will be sent to the bus
with a random delay. The delay is a random time between the shortest delay time and the longest delay
time.*
╚> Repeatedly switching
=> Shortest delay time [min.]
=> Longest delay time [min.]
1 - 254
According to the delay time, which is parameterized in the ETS, the switching time will be sent to the bus
with a random delay. Additionally, the switching time will be switched repeatedly between ON and OFF
with random times between the shortest delay time and the longest delay time. The last switching time is
always a non-delayed OFF.*








