Operator's manual User Manual

16 Gas sampling and gas conditioning technology 2-1.1-ME
Before mounting, the probe must be adjusted to the existing operating conditions.
The existing operational parameters are to be checked accordingly prior to commencing
mounting work.
Low-excess pressure situation
mbar bar
Process temperature
°C, Min. °C Max.
Dust loading
g/m³
Dust composition – grain size
µm
Gas composition
corrosive toxic explosive
Parameters to be measured, e.g. O
2
, CO, SO
2
,
NO
X
,..,
Vol.% mg/Nm³ ppm
Necessary gas flow
l/hr, Min. l/hr, Max.
Necessary T
90
-time
s
14 MOUNTING
M&C SP2000 probes are designed for stationary use and if properly selected and mounted a long
service life and minimum maintenance are guaranteed.
It is advisable to mount the probe in an operational position which is at a 10% inclination to the pro-
cess.
14.1 CHECK OF THE FILTER ELEMENT
Before starting the filter element has to be checked for tight fit.
Figure 3 Cross-sectional drawing SP2000-H
Removing the filter housing lid to check or change the filter element has to be done as follows :