Operator's manual Owner manual

19
Gas sampling and gas conditioning technology 2-1.1.7.2-ME
14.2 CONNECTION OF SAMPLE LINES
All connections for the sample lines are tube connectors out of stainl. steel suitable for connection of

blow back 
NOTE!
When connecting hose pipes to stainl. Steel fittings, a supporting sleeve
must always be used.
The connection must be checked for tightness.
NOTE!
In dependence on the water vapor content respectively the dew point of the
sample gas it is necessary to connect a heated sample line at the undiluted
sample gas outlet.
For connection of the sample lines, tube connectors with dimens
act as follows:
Open the diagonal FRP-housing
Mount the hose pipe or tube to the respective fitting (see drawings in the annex)
Close the diagonal FRP-housing
14.3 CONNECTION OF DILUTION GAS, BYPASS GAS OR BLOW BACK
For 
act as follows:
Open the diagonal FRP-housing
Mount the hose pipe or tube to the respective fitting (see drawings in the annex)
Close the diagonal FRP-housing
-control panels S or S1, corresponding marked connectors for the supply gases
are provided at the rear of the unit.
14.4 CONNECTION OF CALIBRATION GAS
ration gas.
Open the diagonal FRP-housing
Mount the hose pipe or tube to the respective fitting (see drawings in the annex)
Close the diagonal FRP-housing
S or S1, corresponding marked connectors for the supply gases
are provided at the rear of the unit.