Operator's manual Owner manual
16
Gas sampling and gas conditioning technology 2-1.1.7.2-ME
NOTE!
The dilution probe must be checked for its suitability for use with the avail-
able operating parameters prior to installation (see type plate).
13.2 MOUNTING OF THE PREFILTER RESPECTIVELY THE SAMPLE TUBE
The pre-filter or sample tube is mounted together with a suitable sealing by screwing into the
13.3 MOUNTING OF THE PROBE
Put the flange sealing on the bleeder connection.
Fit the mounting piece and the probe flange by means of the attached screws and/or screw nuts.
NOTE!
It is recommended to mount the probe with its sample gas outlet showing
downwards (not necessary for perfect function).
Further it is recommended to mount the probe with a slight descending gra-
dient downwards so that possible deposited drops may flow back into the
process.
13.4 CHECKING THE FILTER ELEMENT
The filter housing cover is dismounted as follows:
Figure 10 Schematic drawing of the filter housing cover
Turn the toggle handle A approximately one rotation to the left side so that the cover is lifted;
Put the handle C into position E;