Operator's manual
12
Gas sampling and gas conditioning technology 2-0.1.1-ME
Carry out the following steps:
230V 50Hz
(115V 60Hz)
Power
1
2
3
4
L
N
L
315W(300W)
Sensor
Tset
Figure 2 Electrical connection SP10-H
Remove the lid of the junction box;
Insert the mains cable (min. 3 x 1.5 mm2) through the cable gland and connect it to the appropri-
ate terminals as in the wiring above;
Screw lid back on;
15 START UP
Before starting up check whether the mains power supply voltage corresponds with the information
stated on the probe’s nameplate.
Switch on mains power supply.
The total heating-up time is approximately 1 hour. The sample gas can now be extracted via the gas
sample probe after this heating-up time.