Operating Manual Electrical heated Filter Type FSS-2K/H350, FSS-3SS/H350, FSS-FW/H350 Gas sampling and gas conditioning technology 5-2.1.
Dear customer, we have made up this operating manual in such a way that all necessary information about the product can be found and understood quickly and easily. Should you still have any question, please do not hesitate to contact M&C directly or go through your appointed dealer. Respective contact addresses are to be found in the annexe to this operating manual. Please also contact our homepage www.mc-techgroup.com for further information about our products.
Content 1 General information .................................................................................................................... 4 2 declaration of conformity ........................................................................................................... 4 3 Safety instructions ...................................................................................................................... 5 4 Warranty ....................................................................
Head Office M&C TechGroup Germany GmbH Rehhecke 79 40885 Ratingen Germany Telephone: 02102 / 935 - 0 Fax: 02102 / 935 - 111 E - mail: info@mc-techgroup.com www.mc-techgroup.com 1 GENERAL INFORMATION The product described in this operating manual has been examined before delivery and left our works in perfect condition related to safety regulations. In order to keep this condition and to guarantee a safe operation, it is important to heed the notes and prescriptions made in this operating manual.
3 SAFETY INSTRUCTIONS Please take care of the following basic safety procedures when mounting, starting up or operating this equipment: Read this operating manual before starting up and use of the equipment. The information and warnings given in this operating manual must be heeded. Any work on electrical equipment is only to be carried out by trained specialists as per the regulations currently in force.
5 USED TERMS AND SIGNAL INDICATIONS DANGER! This means that death, severe physical injuries and/or important material damages will occur in case the respective safety measures are not fulfilled. WARNING! This means that death, severe physical injuries and/or important material damages may occur in case the respective safety measures are not fulfilled. This means that minor physical injuries may occur in case the respective safety measures are not fulfilled.
6 INTRODUCTION Hot sample gas very often contains solids like dust, taar or grime and water vapour. These materials cause problems for a continuous gas analysis, especially when the gas temperature falls below the dew point. The sample line will be blocked and the analyser will be damaged. Therefore the solids have to be separated and a temperature drop below the dew point has to be prevented. For this complex of problems the electrically heated M&C universal filter type FSS-../H350 was designed.
9 DESCRIPTION The M&C filter FSS../H350 is mounted thermally isolated on a plate. The stainless steel filter body with integrated filter element, alternatively of ceramic, stainless steel or special spun glass, is completely covered by a heated metal enclosure. The high capacity heating element is controlled by an incorporated compact capillary sensor thermostat in a temperature range of +50 °C to 350 °C.
11 INSTALLATION INSTRUCTIONS The filter FSS-../H350 is suitable for wall mounting. The aluminium mounting plate is fixed with 4 screws (s. Fig. 1). SKILLED STAFF NOTE! The installation has to be carried out by skilled staff ! Locate the universal filter series FSS-…/H350 in such a way that there is adequate space for removing the cover and replacing the filter elements.
WARNING! NOTE! When connecting the equipment, please ensure that the supply voltage is identical with the information provided on the model type plate! Attention must be paid to the requirements of IEC 364 (DIN VDE 0100) when setting high-power electrical units with nominal voltages of up to 1000 V, together with the associated standards and stipulations.
13 STARTING Before starting the gas conditioning system please pay attention to the site-oriented and processoriented precautions. For the carried media the corresponding safety regulations and measures have to be considered. SKILLED STAFF WARNING! The starting has to be carried out by skilled staff ! Before starting up check whether the mains power supply voltage corresponds with the information stated on the nameplate. Beware of touching the filter surface during operation.
14 SHUT-DOWN SKILLED STAFF The shut-down has to be carried out by skilled staff ! Before shut-down, i.e. switching off the heating, the probe be flushed with inert gas or air in order to avoid condensation of aggressive components from the process gas.
The following steps are recommended removing the filter housing lid (s. Fig. 2): Turn toggle screw „A“ approx.
16 SPARE PARTS LIST Wear, tear and replacement part requirements depend on specific operating conditions. The recommended quantities are based on experience and they are not binding. Electrically heated universal filter FSS-../H350 (C) consumable parts, (R) recommended spare parts, (S) spare parts C/R/S recommended quantity in operation [years] 1 2 3 90 F 0020 Filter element S-2K150, ceramic, 2µm, 150mm C a.t.r. a.t.r. a.t.r. 90 F 0126 Filter element F-3SS150, SS316, 3µm, 150mm C a.t.r.