Operator's manual Manual

12
Gas sampling and gas conditioning technology 5-6.5.1-ME
Figure 2 Electrical connections for FM-200K-H(/FA)
17 STARTING
Before starting up check whether the mains power supply voltage corresponds with the
information stated on the type plate.
Switch on mains power supply.
The total heating-up time is approximately 30 min. The flowmeter then is ready for operation