Instructions / Assembly

Hoopla Swing
ASSEMBLY INSTRUCTIONS
BEFORE YOU START: Observing the following statements and
warnings reduces the likelihood of serious or fatal injury.
ASSEMBLY WARNING:
• Due to the presence of small parts during assembly, keep
out of reach of children unl assembly is complete.
To prevent serious injury, children must not use the swing
unl properly installed. Do not use swing if any damage or
deterioraon is detected or parts are missing. Contact point
of purchase retailer or M&M Sales Enterprises, Inc.
• Never substute parts.
• Please keep instrucons for future reference.
ASSEMBLY INSTRUCTIONS:
• Assembly should be completed by adult person(s). We
intend for our products to bring joy not frustraon.
• A at level surface approximately 5 . x 5 . will be
needed to spread out materials for assembly.
• Two hex wrenches are included for ghtening the seven screws.
MM00174 INSTRUCTION MANUAL
ASSEMBLY • INSTALLATION • OPERATION • MAINTENANCE • SAFETY
Whats in the Box
Lay out all box components
included on a level and
comfortable workspace:
PARTS & HARDWARE
(1) A top bar


(1) D top bar
(2) E handles
(1) F seat
(1) G rubber cover

(1) I carabiner spring clip 8 mm
(1) J clevis holding pin
15mm x 70mm
(1) K washer
15mm x 51mm x 3mm
(2)
8mm w/ M6 Thread
(5)
8mm w/ M6 Thread
(2) N allen hex wrench 5mm
(1) O swivel spinner M10 x 304mm
(1) P tree strap 10 
A
B
C
D
F
E G H
I
K*L*
M*
*Connecng Screws & Washer
Actual Size Below
J
N O P
Figure: 1
At least 6
from the trunk
or 1.5x the
length the
swing
rope.
18”(min)-24”(max) ground clearance.
Tree
Strap
LBS.
150
ASSEMBLY STEPS:
1. Align A (top bar) and D (top bar).
2. Next, slide G (rubber cover) over D (top bar) unl holes align.
3. Once aligned, insert A (top bar) into G (rubber
cover) already covering D (top bar).
4. Slide K (washer) over J (holding pin) and insert through G (rubber cover).
5. Clip I (carabiner) onto J (holding pin).
6. Slide E (handle) over A (top bar) unl holes align.
7. Insert into A (top bar) unl holes align.
8. Using two M (short screws) insert and hand ghten. Using
both N (hex wrenches) ghten both screws all the way.
9. Slide F (seat) over  Then insert 
bar) into the opposite side of F (seat).
10. Underneath the seat, insert L (long screws) on both outside
holes. One M (short screw) will go in the middle hole. Using
both N (hex wrenches) ghten screws all the way.
11. Slide E (handle) over D (top bar) and use reaming M (short screws).
Using both N (hex wrenches) ghten screws all the way.
12. Complete your Hoopla Swing by tying through both handles.
INSTALLATION
TREE LIMB OR CROSS BAR ASSEMBLY: First test
the tree limb or cross bar to ensure that it is secure,
it will support at least 150 lbs., is over level ground,
has a minimum height of 7 feet and is no less than
6 feet on all sides from vercal elements. Swing
should have a clearance of at least 1.5 mes the total
length of all the rope measured from the tree limb/
horizontal beam to the tree strap aachment point.
(See Figure: 1)
GENERAL INSTRUCTIONS:
• DO NOT install home playground
equipment over concrete, asphalt, packed
earth, grass, carpet or any other hard
surface — A fall onto a hard surface can
result in serious injury or death to the
equipment user.
• To prevent serious injury, equipment must
not be used unl properly installed.
Ages
5+
ADJUST SWING HEIGHT
• Adjust swing hanging length so plaorm is parallel with ground. Boom of swing
should be no more than 24 inches and no less than 18 inches from the ground.
• Ensure that the swing hangs horizontal aer adjustment of the ropes.
• Never add extra length to chain or rope. The chains or ropes provided are the
maximum length designed for the swinging element(s).
1. 2. 3.
4.
6. 7.
8.
5.
10.9. 11.
12.
NOTE: Connued on Back Side

Summary of content (2 pages)