Installation Instructions

Page 2
Installation Instructions
8
Place back panel and then mark
placement. Repeat for side
panels.
SIDE PANEL
4
Place one side panel on packing
carton to create a template. Cut
carton to same size as side panel.
Mark one side of template with
an "X" and always place "X" side
toward wall.
5
Place template over faucet controls.
"X" side goes against wall. Template
should be ush with front edge
of bathtub and back wall. If not,
cut template to t. Mark faucet
locations. Cut holes in template
where marked. Trial t template
over faucet controls.
6
Place side panel on a at surface
with protective lm side up.
Position template with X side
down over side panel. Make
sure front edge and bottom are
lined up. Mark hole locations and
panel edge(s). Trimmed edge
goes under caddy.
7
Remove template. Carefully cut*
holes and edge(s) of panel with
utility knife. Trimmed edge
goes under caddy. Repeat
process for right side panel.
Template
Template
Use Carton as
Template
Left Side Panel
*IMPORTANT — Cut holes from front side. Cover area to be cut with masking tape to prevent chipping and scratching.
Drywall sets above
bathtub ange
Bathtub
Flange
1
Remove faucet handles, trim,
faucet spout and shower door/
curtain.
2
Wall surfaces must be SOLID,
SMOOTH, CLEAN, DRY and
PLUMB. Remove soap residue,
loose plaster, paint or wall paper.
Wall kit may be installed over
existing tile.
3
Replace damaged or standard
drywall with waterproof drywall.
Waterproof drywall must be
installed to studs above bathtub
ange for a plumb surface.
Trimmed
edge
goes
under
caddy
Left Side Panel
Trial t all panels and corner
caddies.
17