L24TWS & L24TWD Care & Use
Connecting the Keg to the Beverage Tower.
1) Attach the clear hose from the beverage tower to the
barbed fitting with the hose clamp provided. Insert the
rubber washer provided into the fitting.
2) An elbow is included to provide additional space above the
keg coupler. Secure the elbow to the top outlet of the keg
coupler with a washer between. Attach the clear hose
fitting, with washer, to the elbow. Use a wrench to tighten
the connections.
3) The colored hose line is installed onto the side barbed
fitting of the keg coupler and the barbed fitting below the
CO2 regulator. Press the tube onto the fittings and secure
with the two hose clamps.
Refer to the instructions provided with the CO2 tank before
attaching the tank to the regulator.
4) With the regulator and tank in the OFF position, attach the
regulator securely to the CO2 tank with a wrench.
The Kit is Ready to Attach a Keg.
The Beverage Tower Kit is provided with a standard D Style coupler.
This style is appropriate for most domestic beers. Additional styles
are available from restaurant supply or beverage companies.
1. Align lug locks on
coupler with lug housing in
top of keg; insert coupler.
2. Turn coupler 1/4 turn
clockwise; the coupler is
now secured to keg.
3. Push down on the
coupler and give another ¼
turn, to open beer and CO
2
ports in keg. The keg is now
tapped.
Operating the Beverage Tap:
1) Insert the CO2 canister in the rear left shelf inside the refrigerator.
2) Place the beer keg inside the refrigerator and arrange all hoses such
that none are pinched.
3) Slowly open the main valve on the CO2 canister. Check for leaks.
4) Slowly open the regulator ball valve to pressurize the keg.
5) Toggle the tap handle on the tower to dispense a small amount of
liquid. This will “charge the system”.
6) Adjust the T-handle on the regulator to between 8 and 14 PSI. The
pressure setting will vary for beer type and keg style. Refer to the
troubleshooting guide and experimentation to set the pressure
accordingly.
7) Allow the system to rest for several hours before use. Temperature
and pressure are critical to satisfactory results.
CO2 Tank level
Main Valve
T-Handle
8-14 PSI
Ball Valve




