Beverage Towers Care & Use Manual L(24TWS / L24TWD)

Connecng the Keg to the Beverage Tower.
1. Aach theclear hose from the beverage tower to
the barbed ngwith the hose clamp provided.
Insert the rubber washer provided into the
ng.
2. An elbow is included to provide addional
space above thekeg coupler. Secure the
elbow to the top outlet
of the keg coupler
withawasherbetween.Aachtheclearhose
ng, with washer, to the elbow. Use a
wrenchtoghtentheconnecons.
3. Thecoloredhoselineisinstalledontotheside
barbedngofthekegcouplerandthe
barbedngbelow
theCO
2
regulator.Press
thetubeontothengsandsecurewiththe
twohoseclamps.Refertotheinstrucons
providedwiththeCO
2
tankbeforeaaching
thetanktotheregulator.
4. With the regulator and tank in the OFF posion,
aachtheregulatorsecurelytotheCO
2
tankwitha
wrench.
The Kit is Ready to Aach a Keg.
TheBeverageTowerKitisprovidedwithastandardDStylecoupler.
Thisstyleisappropriateformostdomescbeers.Addionalstylesare
availablefromrestaurantsupplyorbeveragecompanies.
BallValve
1. InserttheCO
2canisterintherearleshelfinsidetherefrigerator.
2. Placethebeerkeginsidetherefrigeratorandarrangeallhosessuchthatnonearepinched.
3. SlowlyopenthemainvalveontheCO
2canister.Checkforleaks.
4. Slowlyopentheregulatorballvalvetopressurizethekeg.
5. Togglethetaphandleonthetowertodispenseasmallamountofliquid.Thiswill“chargethe
system”.
6. AdjusttheThandleontheregulatortobetween8and14PSI.The
pressuresengwillvaryfor
beertypeandkegstyle.Refertothetroubleshoongguideandexperimentaontosetthepressure
accordingly.
7. Allowthesystemtorestforseveralhoursbeforeuse.Temperatureandpressurearecricalto
sasfactoryresults.
Operang the Beverage Tap:
Usesuppliedhose
clampshere
1.Alignluglocksoncouplerwithlug
housingintopofkeg;insertcoupler.
2.Turncoupler¼turn
clockwise;thecoupleris
nowsecuredtokeg.
3.Pushdownonthecoupler
andgiveanother¼turn,to
openbeerandCO
2
portsinkeg.
Thekegisnowtapped.
CO
2
TankLevel
MainValve
814PSI
THandle