Measurement Guide
4
SS-B01Rev. D 012019Luxier
Installation
1. Position valve body in wall. It is recommended the valve to be about 48” above the oor and shower
outlet to be about 30” above the valve (Fig. A1) The nished wall should be set between the markers on
the temporary protective cover. The recommended depth is 2 11/16” to 3 7/16”. (Fig. A) Make sure the
UP outlet is pointed upward. (Fig. B)
NOTE: Valve access hole on the wall should be 6” in diameter and outlet hole for shower arm is about 1
1/4” in diameter.
2. Connect the valve to the plumbing with proper ttings. Perform a dry t before soldering pipes to the
valve. (Fig. C)
WARNING: Exposure to high temperature will damage the cartridge (9) and stop valves (7, 8). Remove
these parts before soldering.
48”
30”
* Drawing not to Scale
A1
3. After the pipes are soldered, install the stop valves (7, 8), cartridge (9), stem (11), and threaded
nipple (12) back onto the valve body.
4. Pressure test and ush the valve. NOTE: Pressure must be approximately equal on both hot and cold
side for the valve to function properly. (Fig. D)
• Install a 1/2” iron pipe plug (not included) on the shower outlet.
• Turn the valve to ON position and check all connections for leaks for about a minute.
• Turn the valve to OFF position after pressure test. Make sure the pipes are free of debris or
sediments and remove the 1/2” plug.
Finished Wall
Protective Cover
Recommended
2 11/16” - 3 7/16”
A
Mounting Hole
Mounting Hole
B
WARNING: Remove all parts before solder
Stop Valve (7, 8)
Cartridge (9)
C
D





