Installation Guide

Luxier SP27-CEC Rev. A 0220209
Installation (cont.)
8. Attache shower head. Apply some (NOTE: PTFE tape on the
thread to prevent leaking)
9. Connect hand shower hose to the main panel body and con-
nect hand shower to the hose. Make sure to install the rubber
washers in the connections.
1
2
3
4
5
6
100
o
F
10. For your convenience, a small screwdriver (6) is included
with the unit for battery replacement. Use the screwdriver to
remove the 4 small screws (5) on the battery compartment door
(3). Please make sure 2 AA batteries (2) are properly installed
in the battery compartment (NOTE: batteries not included). And
make sure the silicon gasket is seated properly to waterproof the
battery assembly. Once the batteries are install, press down the
main power switch (4) to provide power to the digital display.
11. This LCD display is powered by running water and 2 AA
batteries. With the water running on the shower panel. Press
the small button under the digital screen to display current water
temperature. The display will automatically shutdown about 18
seconds after the water is turned o󰀨.