Installation Guide
Luxier SP06-SS Rev. A3 0920168
Installation (cont.)
Lift the panel to determine the proper height and placement. It is recommened to aim 
the top horizontal body jet to the chest area for optimal showering experience. 
444mm
17.48”
4. Mark the positions of the 2 brackets on the 
wall and set a side the panel. (NOTE: The 
distance between the two brackets should be 
444 mm or 17.48”)
5. Using a drill with a tile bit, drill the hole 
slowly into the tile. Do not drill into any piping 
or wiring in the wall. Insert the anchors into 
the wall. (NOTE: Before installing the wall 
anchors, use a small piece of painters tape 
or masking tape over the drill area. This will 
prevent damages to the tile)
1”
6. Secure the mounting brackets to the wall. 










