Luxier SP04-SS Features - Stunning stylish European inspired design - Elegant durable stainless steel frame construction - 4 stage shower functions (Rainfall, Waterfall, Massage Spray, Hand Shower) - Simultaneous operation of all shower functions* - Thermostatic valve control minimize the chance of scalding * Proper water pressure is required for simultaneous operations Luxier 1 SP04-SS-D Rev.
Thank you for purchasing Luxier products. Please read the information below and keep this installation guide for future reference. If you require assistance, please contact our customer service department at 1-877-711-8828, Monday - Friday 9AM - 5PM Pacific Time. Or by email at support@luxierusa.com.
Attention • This installation guide is subject to change without notice, please contact us to request the most updated version of this installation guide. • This is a general installation guideline, actual installation may vary. Consult a professional if necessary. • Product drawings in this installation guide is for illustration purpose only. Actual product may vary depends on model. • Always take extra precautions and wear appropriate safety equipment when installing this product.
Fig. A * Shower panel drawing on this page is for illustration purpose only. Actual product may vary depends on model. Recommended 10” - 12” It is recommened to aim the top horizontal body jets at the chest area of the user for optimal showering experience. The installation height of the outlet box is approximately the total distance of measurement A and measurement B. Approximate shower inlet valve location approx.
Technical Data Compliance with the following code(s) and standard(s): Uniform Plumbing Code (UPC®) National Plumbing Code of Canada IAPMO IGC 154-2016 Recommended Operating Pressure: 60 psi 180mm 7.09” 499mm 19.65” 1,600mm 62.99” 850mm 33.46” 760mm 29.92” 480mm 18.9” 380mm 14.96” 60mm 2.36” *All Measurements are Approximate Luxier 5 SP04-SS-D Rev.
Parts List 2 10 9 1 11 12 3 4 13 5 7 8 6 14 01. Shower Panel Body 02. Top Cover 03. Hand Shower 04. Hand Shower Cradle 05. Silicon Gaskets 06. Hand Shower Hose 07. Hand Shower Water Connector 08. Gasket 09. Screws x 4 10. Mounting Brackets x 2 11. Wall Anchors x 4 12. Valve Stems x 4 13. Thermostatic Valve 14. Check Valves x 2 Luxier 6 SP04-SS-D Rev.
Installation 2 3 4 5 1. Install hand shower cradle (1) to the shower panel by installing the rubber washer (2) and the locking nut (3) and attach white plastic hose tube connector (5) with PVC tubing to complete the connection. (NOTE: Make sure the silicon gasket (4) is seated properly inside the connector.) 1 2. Connect hand shower hose to the main panel body and connect the hand shower wand to the hose. Make sure the silicon gaskets are seated properly to prevent water leak. 3.
Installation (cont.) 5. Secure the mounting brackets to the wall with the screws. 6. Apply thread sealant tape to the threading on the shut-off valves before connect both hot and cold water supply hoses to the valves. IMPORTANT : - Make sure the water supply hoses are connected to the corresponding shut-off valves - i.e. cold water hose to the cold water valve and hot water hose to the hot water valve. The thermostatic valve will not function properly if the hoses are installed incorrectly.
Operation Function Selectors Temperature Control 1. Turn the temperature control knob to set the desired water temperature. The control is preset to maximum temperature of 100.4 degrees Fahrenheit. To set higher water temperature, push down the safety pin and turn the dial counterclockwise to the desired temperature mark. (IMPORTANT: Scalding may occur if bypass the safety pin, use this control with caution) 2. Select the desired water function by turning the selector to the corresponding marking.
Troubleshooting NOTE: To maintaine the performance of the shower panel. The thermostatic valve needs to be cleaned at least once a year. More frequent cleaning is needed if water has high mineral content. NOTE: Proper pressure must be maintained for the thermostatic valve to work properly. Make sure water pressue is about the same on both hot and cold water side. 1.
Cleaning The Thermostatic Valve Before You Begin • Read and understand this instruction completely before service the shower panel. • Make sure the water supply is shut off to the unit. If necessary, shut off the water to the entire house. • Turn on one of the faucets in the house to relieve the water pressure in the plumbing system. • Make sure the service site is clean and free of dust and debris. Parts Diagram Fig. C Fig. D 9 7 6 Fig. A 5 4 100 .4 3-1 3 Fig. E 8 2 Fig. B 1 1. Cap 2.
Calibrating The Thermostatic Valve Before You Begin • Read and understand this instruction completely before service the shower panel. • Make sure the service site is clean and free of dust and debris. The valve may needs to be recalibrated after the valve was replaced or cleaned. The thermostatic valve is preset at 100.4 degree Fahrenheit when the safety pin is pointing at 12 o’clock position (Figure F) This is the starting point of the calibration.