User's Manual

1 2 3 4
1 2
A B C
1 2 3 4 5 6 L N
Contact Closure Input Wiring
24 V 50 mA
For settings, see the full installation
and operation guide at
www.lutron.com/qs.
®
1 2
A B C
N H 1 2 3 4 5 6
1 2 3 4
1 2 3 4
1 2
A B C
1 2 3 4 5 6 L N
A B C
Note: Use appropriate wire connecting
devices as specified by local
codes.
Example:
Occupancy sensor
(maximum 1)
1: COM
2: 24 V *
3: MUX
4: MUX
QS Link Control Wiring
24 V 100 mA
Wiring the GRAFIK Eye® QS Control Unit:
Overview of IEC PELV/NEC
® Class 2 Wiring
IR Wiring
From external
IR connection
(by others)
18 AWG (1.0 mm
2
)
each terminal
18 AWG (1.0 mm
2
)
each terminal
1: IR DATA
2: IR COM
A: CCI SIG
B: 24 V
C: CCI COM
To control stations,
shades, or other
GRAFIK Eye® QS
control units
Data (terminals 3 and 4):
Twisted, shielded pair 22 AWG (0.5 mm
2
)
each terminal
Common and power (terminals 1 and 2):
Two 18 AWG (1.0 mm
2
) each terminal (for link <500 ft/153 m)
Two 12 AWG (4.0 mm
2
) each terminal (for link 500-2000 ft/153-610 m)
* Do not connect terminal 2
between any GRAFIK Eye® QS
control unit and any other power
supply, including another GRAFIK
Eye
® QS control unit.
See “Power Group Wiring” for a
detailed wiring example.
A B C
Example:
Emergency lighting interface (maximum 1)
Note:
The GRAFIK Eye® QS control unit
mustbepoweredbyaNormal/
Emergency distribution panel for
proper ELI operation. Refer to the
LUT-ELI-3PH Installation Guide for
the complete wiring diagram.
A: CCI SIG
B: 24 V
C: CCI COM
LUT-ELI-3PH
Signal
+V Input
Circuit Common
For additional information, see the complete installation and operation guide at www.lutron.com/qs
GRAFIK Eye® QS Control Unit Quick Installation and Operation Guide 6